Bim Modeling Bim Services Project Management Reality Capture
Schematic Design and Pre-feasibility Report for Unicentro Plaza Parking Annex
Project Overview: Drone Survey of Existing Conditions: Conducted aerial surveys…
29 ene 2019
Project Overview:
-
Drone Survey of Existing Conditions: Conducted aerial surveys to capture detailed exterior site conditions.
-
Point Cloud Creation via Aerial Photogrammetry: Produced a detailed point cloud for precise modeling.
-
Parking Levels Modeling: Developed architectural models for the parking structure levels.
-
Cost Estimation: Provided detailed cost assessments for budget planning.
-
Time and Methodology Analysis: Analyzed project timelines and work methodologies to optimize construction plans.